Oil , Gas and EnergyWorld NEWS

IEC Starts 3D Seismic at Kruh Block in Indonesia

IEC said the results of the seismic work will allow it to drill new production wells at the Kruh Block by the end of the year.IEC said the results of the seismic work will allow it to drill new production wells at the Kruh Block by the end of the year.  Read More 

Show More

Related Articles

Back to top button
WP Twitter Auto Publish Powered By : XYZScripts.com

Adblock Detected

Please, turn off your Ad-blocker