Oil , Gas and EnergyWorld NEWS

ADNOC Drilling Bags $733MM Contract for 3 Rigs at Zakum Field

The ADNOC Drilling fleet is now expected to total at least 148 by 2026 including these three new rigs.The ADNOC Drilling fleet is now expected to total at least 148 by 2026 including these three new rigs.  Read More 

Show More

Related Articles

Back to top button
WP Twitter Auto Publish Powered By : XYZScripts.com

Adblock Detected

Please, turn off your Ad-blocker